Sequenced Re-completions in Horizontal Wells

  • A very short length of Big Hole perforations
  • Jet Pump landed at the perforations (sourcerock.ca)
  • 1500m laterals can have up to 16 Re-completion Sequences
  • A Re-completion’s Drained Area is similar to an off-setting vertical well’s
  • Ideal conditions could result in 50% primary recovery of OOIP from a 1500m lateral